Completed Work:
  • Roof leaks stopped (tin for temporary fix till we can afford the natural wood shingles)
  • Reconstructed rotted framing on north wall
  • Building was moved 5 1/2 miles
  • Assembled side addition back into place
  • Windows re caulked and broken windows replaced
  • Built new porch
  • 90% exterior painted done
Exterior work completed:
  • Lowered ceiling was removed to show the original ceiling
  • Wallpaper removed from lowered ceiling up (11'-15' up wall)
  • Patched cracks and holes in plaster where lowered ceiling was, sanded, scrapped
  • Patched holes in ceiling from lowered ceiling supports
  • repainted from ceiling down
  • Floor furnace hole patched as well as some termite damage in flooring replaced
  • Located and painted where the original painted on chalk board surface was located
  • Interior doors trimmed so they will shut properly (2 doors so far 2 more to go)
  • Removed light switches/ panels etc to return the look to the pre-REA era
Interior work completed:
(Class room /Vestibule)
  • Wallpaper removed in East cloak room (on ceiling and walls down to wains coating)
  • In West cloak room- preped to paint walls/ ruined ceiling plaster removed (due to
    weather leakage)
  • In East cloak room- ruined plaster removed from east wall (due to weather leakage)
Interior work completed:
(Cloak Rooms)
Uncompleted Work:
Exterior work to do:
Interior work to do:
(Class room /Vestibule)
Interior work to do:
(Cloak Rooms)
  • Finish exterior painting done for now!
  • Construct a replica bell tower / insert antique school/farm bell
    purchased 11/5/2010.
  • Set Flag pole (in memory of Rutha Dean Shoffner Glasse) with original
    foundation lime stone rock mortared together around the flag pole
  • Set outhouse in place to use and repaint etc Hole is dug!
  • Replace broken window on front of building
  • Replace the addition door that is falling apart.  Done!
  • Finish removing ruined termite damaged flooring throughout
    schoolhouse/sand/restain
  • Install Wood stove Stove installed just need a metal plate to put under it
    and get the pipe to install up through the ceiling and weather proof, etc!
  • Put new plaster board on West cloak room ceiling and East cloak room East wall  Done!
  • Patch cracks and hole in east and west cloak rooms mostly done!
  • Finish scrapping old paint in East Cloak room Done!
  • Repaint Ceiling and walls in both Cloak rooms Ceilings painted
  • Finish cleaning paint off door plates throughout schoolhouse
  • Install donated brown porcelain door knobs and maintain door knob hardware

    It feels so good to see the to-do list get smaller and smaller!!
Please feel free to donate
supplies or your time to
help do what is left to do!

Call Mike or Valerie @ 620-
845-2474
email:
cowgirlupgood@yahoo.com

A non-taxable contribution
may be made to the
“Belleview School House
Restoration Project” c/o
First National Bank of
Wellington, 206 E. Harvey,
Wellington, KS 67152.